George Fisher Mine Underground Truck Loading Station
Project Description.
The Truck Loading Station project involved the relocation of an existing Truck Chute, new Ore Pass Transition chute, new platform and access as well concrete and foundation design. We produced a concept model which was then developed to produce fully detailed fabrication drawings and concrete construction drawings.